> Southbound I-25 fully open after construction equipment causes lane closures
Southbound I-25 fully open after construction equipment causes lane closures
Clip ID 2625132
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
All lanes of southbound Interstate 25 are back open near 20th Avenue after a construction mishap, which resulted in a large piece of construction equipment blocking four lanes for most of Wednesday morning.
According to CDOT spokeswoman Tamara Rollison, the equipment, known as a shuttle buggy, is used to transfer hot mixed asphalt. It fell from a flatbed truck and landed on its side around 4:30 a.m. Wednesday in a coned-off work zone as contract crews were removing the equipment following overnight resurfacing work on the highway.
Read more at: https://www.9news.com/article/traffic/construction-mishap-i25-20th-street/73-c05067fe-5289-45a2-941c-6c39b6ff7cc6
More local videos here: https://youtube.com/@9news
Subscribe to NEXT: https://youtube.com/@Nexton9NEWS
Stay connected:
9NEWS Website: https://www.9news.com/
Facebook: https://www.facebook.com/ilike9news
X: https://twitter.com/9NEWS
Instagram: https://www.instagram.com/9newsdenver/
Download the 9NEWS App: https://www.9news.com/appredirect/
Sign up for the 9NEWSLETTER: https://www.9news.com/email
9NEWS (KUSA) is located in Denver, Colorado.