> East County residents will soon turn wastewater into tap water
East County residents will soon turn wastewater into tap water
Clip ID 2299676
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
Construction on the new East County Advanced Water Purification facility is well underway. When completed, it will turn 15 million gallons of wastewater into purified water for people in Lakeside, Santee, El Cajon and the surrounding areas.
The $950 million facility is being built with 10 million pounds of reinforcing steel, enough concrete to fill 16 Olympic-sized swimming pools, and tanks and basins big enough to hold 3 million cubic feet of water. Eventually, it will pump out 11.5 million gallons of purified water a day.
“This project will create a new, local, and sustainable drinking water supply that is uninterruptible and available to us both dry and wet seasons,” said Rebecca Abbott, Engineering Manager for Advanced Water Purification.
FULL STORY: https://www.cbs8.com/article/news/local/wastewater-tap-water-east-county-residents/509-37bb3216-5702-4936-bff1-bc7e2bf8d42b