> Southbound I-5 freeway lanes reopen ahead of schedule
Southbound I-5 freeway lanes reopen ahead of schedule
Clip ID 2303432
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
Caltrans has scheduled two major, 56-hour weekend closures in September through Downtown San Diego on Interstate 5 (I-5) to repair the bridge deck over State Route 163 (SR-163). Crews will close lanes to repair the bridge deck in both directions of I-5 on separate weekends. Caltrans opened the southbound I-5 freeway earlier than expected Sunday afternoon.
FULL STORY: https://www.cbs8.com/article/news/local/downtown-i-5-closures-planned-by-caltrans/509-f16bade0-9574-4cb4-891d-709498fe335e