By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
Metro Parks Tacoma is set to break ground Monday on a new trail in Point Defiance Park.
The groundbreaking is phase one of the Loop Trail project, which will give park visitors better access to key points in the park.
The Loop Trail will be a paved trail for pedestrians and cyclists, connecting Wilson Way bridge, the pagoda, Owen Beach, Point Defiance Zoo & Aquarium, the roundabout and back.
According to the Metro Parks Tacoma website, phase one will also include the following:
A new sidewalk and improvements to Park Avenue west of the roundabout to the park road near the Mildred Street entrance
Paving on top of the current gravel Trolley Lane trail leading north from the roundabout over grass to the Japanese Garden, featuring a small plaza at the entry to the Wilson Way bridge and a safer pedestrian road crossing near the garden
Phase two, which has not yet been permitted will begin construction in 2023.
READ THE FULL STORY:
https://www.king5.com/article/news/local/tacoma/tacoma-loop-trail-point-defiance-park/281-b451b405-4c9c-4283-bf6b-ba480138877d