By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
C-Dot is ramping up rock blasting on the Floyd Hill project west of Denver along I-70. It means daily closures east and westbound between 9 AM and 3 PM, but you can get text messages that narrow those times down. Texting 21000 and typing floydhill (one word lower case) will sign you up for text messages alerts that tell you when the blasting will start and when it will end, allowing you to hopefully avoid some of those closures and congestion.
More local videos here: https://bit.ly/2Pa0d1l
Subscribe to NEXT: http://bit.ly/2eP1GwI
Stay connected:
9NEWS Website: http://www.9news.com/
Facebook: https://www.facebook.com/ilike9news
X: https://x.com/9NEWS
Instagram: https://www.instagram.com/9newsdenver/
Download the 9NEWS App: https://www.9news.com/appredirect/
Sign up for the 9NEWSLETTER: https://www.9news.com/email
9NEWS (KUSA) is located in Denver, Colorado.