> RTD gearing up for first phase of downtown reconstruction project
RTD gearing up for first phase of downtown reconstruction project
Clip ID 2461335
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
Current infrastructure is 30 years old and deteriorating. The $152 million project aims to improve safety, address infrastructure issues and extend design life.
More local videos here: https://youtube.com/@9news
Subscribe to NEXT: https://youtube.com/@Nexton9NEWS
Stay connected:
9NEWS Website: http://www.9news.com/
Facebook: https://www.facebook.com/ilike9news
Twitter: https://twitter.com/9NEWS
Instagram: https://www.instagram.com/9newsdenver/
Download the 9NEWS App: https://www.9news.com/appredirect/
Sign up for the 9NEWSLETTER: https://www.9news.com/email
9NEWS (KUSA) is located in Denver, Colorado.