> DIA completes repairs to damaged section of train to the gates
DIA completes repairs to damaged section of train to the gates
Clip ID 2465940
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
Normal operations resumed early Wednesday after crews completed repairs to the running surface of the trains that run between the concourses and the terminal.
More local videos here: https://youtube.com/@9news
Subscribe to NEXT: https://youtube.com/@Nexton9NEWS
Stay connected:
9NEWS Website: http://www.9news.com/
Facebook: https://www.facebook.com/ilike9news
Twitter: https://twitter.com/9NEWS
Instagram: https://www.instagram.com/9newsdenver/
Download the 9NEWS App: https://www.9news.com/appredirect/
Sign up for the 9NEWSLETTER: https://www.9news.com/email
9NEWS (KUSA) is located in Denver, Colorado.