Search
 > Media Pool
 > Vail Pass closures coming this summer
Vail Pass closures coming this summer
Clip ID 2495969
Clearance Not Cleared
Add to
Share
By Request

By Request assets are not available for immediate purchase.

This content has not been pre-checked for copyright.

Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
CDOT has started summer construction again on Vail Pass and this summer drivers will be impacted more than ever. CDOT crews are installing an eastbound auxiliary lane an eastbound bridge, wildlife fencing and a new avalanche mitigation fence along I-70 near Vail Pass. That work will mean rock scaling operations along with East and westbound I-70 closures starting in June Monday through Friday 9 AM to 2:30 PM. At the same time, CDOT will be doing rock blasting enclosures for the Floyd Hill project. People can sign up for text alerts through CDOT to narrow down the times of blasting so they don’t get stuck in both closures. More local videos here: https://bit.ly/2Pa0d1l Subscribe to NEXT: http://bit.ly/2eP1GwI Stay connected: 9NEWS Website: http://www.9news.com/ Facebook: https://www.facebook.com/ilike9news X: https://x.com/9NEWS Instagram: https://www.instagram.com/9newsdenver/ Download the 9NEWS App: https://www.9news.com/appredirect/ Sign up for the 9NEWSLETTER: https://www.9news.com/email 9NEWS (KUSA) is located in Denver, Colorado.
Station
KUSA