By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
Starting Friday, May 30, the existing off-ramp from inbound Peña Boulevard (heading to DEN) to Jackson Gap Street will be closed for construction. While a temporary off-ramp is available, construction activity in the area will cause travel impacts. As such, it is strongly recommended that drivers use the 75th Avenue off-ramp, which is located west of the Jackson Gap Street off-ramp, and follow detour signs for Jackson Gap Street. During this phase of work, westbound traffic on 75th from Jackson Gap is prohibited. Detour routes will be in place and signs will be posted.
Inbound traffic heading toward the Pikes Peak shuttle lot must exit at 75th, which is the first posted cell phone lot exit (approaching Gun Club Road, just east of E-470). Drivers on Jackson Gap will not be able to travel westbound on 75th to the Pikes Peak shuttle lot. To access the Pikes Peak shuttle lot from the Terminal, using outbound Peña (leaving westbound from DEN), drivers will need to exit Peña at Jackson Gap and travel north on Jackson Gap to westbound 78th Avenue. Then, drivers must proceed to southbound Gun Club Road.
The work will allow crews to reconstruct the existing intersection at the bottom of the off-ramp to align with a future diverging diamond interchange, which is part of DEN’s Peña Phase 1B project.
More local videos here: https://youtube.com/@9news
Subscribe to NEXT: https://youtube.com/@Nexton9NEWS
Stay connected:
9NEWS Website: https://www.9news.com/
Facebook: https://www.facebook.com/ilike9news
X: https://twitter.com/9NEWS
Instagram: https://www.instagram.com/9newsdenver/
Download the 9NEWS App: https://www.9news.com/appredirect/
Sign up for the 9NEWSLETTER: https://www.9news.com/email
9NEWS (KUSA) is located in Denver, Colorado.