> Kenner Mayor says changes are needed at pumping stations after failure during Francine
Kenner Mayor says changes are needed at pumping stations after failure during Francine
Clip ID 2534564
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
To ease the strain on the parish’s drainage system, Glaser said hopes to accelerate the construction of two new pumping stations already in the design stage.