By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
The Indiana Department of Transportation (INDOT) says work on the interchange between I-465, US-31 and Meridian Street will get an overhaul soon.
Starting on or after Monday, Oct. 6, crews will begin doing work in a two-mile improvement area along US-31/Meridian Street and I-465 for "Level Up 31."
That work will include a speed limit change on both I-465 and US-31 in the area, dropping the speed limit down to 45 mph.
Phase one of the work will include:
- Closure of the southbound U.S. 31 ramp to 106th Street through late-December
- Closure of eastbound 106th Street at U.S. 31 through late-December
- Closure on the eastbound I-465 ramp to southbound Meridian Street through mid-December
MORE: https://www.wthr.com/article/traffic/traffic-news/traffic-alert-closures-restrictions-meridian-street-i-465-interchange-carmel-indy-indot-road-work-ramp-closures-106th-street-slow-downs-detour/531-df4cb2f8-d43b-44a9-a33a-de6ea66c673f