> Why Colfax BRT construction isn't done block-by-block, but instead 4 miles at a time
Why Colfax BRT construction isn't done block-by-block, but instead 4 miles at a time
Clip ID 2625802
Clearance
Add to
Share
Add to Review Link
By Request
By Request assets are not available for immediate purchase.
This content has not been pre-checked for copyright.
Per clip rates are for 20 seconds of final usage. If you are using more then 20 seconds or need a different file format or have questions about clearances contact us
Description
The $280 million, 10-mile Colfax Avenue Bus Rapid Transit construction project has nearly four consecutive miles of roadway blocked right now.
More local videos here: https://youtube.com/@9news
Subscribe to NEXT: https://youtube.com/@Nexton9NEWS
Stay connected:
9NEWS Website: https://www.9news.com/
Facebook: https://www.facebook.com/ilike9news
X: https://twitter.com/9NEWS
Instagram: https://www.instagram.com/9newsdenver/
Download the 9NEWS App: https://www.9news.com/appredirect/
Sign up for the 9NEWSLETTER: https://www.9news.com/email
9NEWS (KUSA) is located in Denver, Colorado.